Landscape Works Company in Saudi Arabia

FSAK is a landscape works company in Saudi Arabia delivering design, hardscape, softscape, irrigation, water features, and maintenance for commercial, residential, and government projects. We are a Riyadh-based contractor with over 20 years of construction experience, serving clients across Riyadh, Jeddah, Dammam, and the wider Kingdom. From concept design to final handover, we build outdoor spaces that survive the Saudi climate and meet KSA quality standards.

Need a landscape partner who turns up on time and hands over without defects? You are in the right place. We mobilise trained crews and our own equipment from our Riyadh base to project sites across KSA.

Design to maintenance Water efficient One contract Vision 2030 aligned

Villas · Parks · Resorts · Public realm

Who We Work With in KSA

Who are FSAK's landscape services for?

We serve a broad range of buyers across Saudi Arabia:

  • Real estate developers building residential compounds and mixed-use districts
  • Government bodies and municipalities delivering parks, public realm, and greening projects
  • Hospitality and tourism developers building hotels, resorts, and entertainment zones
  • Commercial property owners landscaping plazas, headquarters, and retail frontages
  • Industrial clients are greening factory and plant grounds
  • Private villa and palace owners wanting bespoke gardens

Whether the project is a single villa garden or a large urban landscape package, our team scales to fit.

 
Our Process

How does a landscape project work with FSAK?

Every landscape project follows the same clear, accountable steps from first visit to handover.

We follow a clear, tender-grade process so you always know the next step:

  1. Site assessment — we visit the site, study soil, drainage, sun, and access.
  2. Design and BOQ — we produce the landscape design and a clear bill of quantities.
  3. Quotation and contract — we issue a transparent quote with scope and timeline.
  4. Mobilisation — we bring crews, plants, materials, and equipment to site.
  5. Execution with HSE oversight — we build hardscape, install softscape, and fit irrigation under safety supervision.
  6. Quality control — we inspect every stage against the agreed standard.
  7. Handover and maintenance — we hand over a finished space and offer an ongoing care plan.
Full scope

What landscape works does FSAK deliver in Saudi Arabia?

FSAK delivers a full landscape scope under one contract, so you deal with one accountable team instead of five subcontractors. Our service covers everything from the first design sketch to a year-round maintenance plan.

Landscape design and master planning

Our landscape designers produce concept plans, master plans, planting layouts, and paving designs for projects of any size. Every plan is built around the Saudi climate, water efficiency, and the way people will actually use the space. We design for villas, compounds, commercial plazas, parks, and large urban developments.

01

Hardscape installation

Hardscape is the built part of a landscape. We install paving, walkways, retaining walls, kerbs, seating areas, pergolas, gazebos, and structural features. We use durable materials chosen for heat, sun, and heavy foot traffic, so the finish lasts for years.

02

Softscape and planting

Softscape is the living part. We supply and plant trees, shrubs, ground cover, seasonal flowers, lawns, and palm trees, including mature Washingtonia and date palms. We select species that thrive in Saudi conditions and need less water, then manage soil, fertiliser, and establishment so the planting takes hold.

03

Irrigation, drainage and water features

Water is the single biggest factor in a Saudi landscape. We design and install efficient irrigation systems, drip lines, sprinklers, pumps, and drainage to protect plants and prevent water damage. We also build fountains, waterfalls, and decorative water features that look striking while staying water-efficient.

04

Landscape maintenance

A landscape is only as good as its upkeep. We offer ongoing maintenance contracts covering irrigation checks, pruning, mowing, fertilisation, pest control, and seasonal replanting, keeping outdoor spaces healthy across Riyadh, Jeddah, Dammam, and the Eastern Province all year round.

05
One contract
Bundle landscaping with earthworks and utilities

One accountable team instead of several subcontractors.

Why FSAK

Why choose FSAK for landscape works in KSA?

  • 20+ years of construction experience in the Saudi market
  • Riyadh-headquartered Saudi contractor with KSA-wide reach
  • Full landscape scope under one contract — design, hardscape, softscape, irrigation, maintenance
  • Own equipment fleet, so we do not depend on third-party machinery
  • In-house crews — designers, supervisors, operators, and skilled labour
  • Government, developer, and corporate client experience
  • Vision 2030-aligned delivery standards
  • Bilingual project management in Arabic and English
  • One point of contact from quote to handover

As a full construction contractor, FSAK can bundle landscaping with earth and enabling works, utilities, and civil works that pure landscaping firms cannot offer.

Vision 2030

Landscaping and Vision 2030 in Saudi Arabia

Saudi Arabia’s Vision 2030 and the Saudi Green Initiative are driving major demand for greening, public parks, and sustainable outdoor spaces across the Kingdom. Giga-projects, new residential districts, and city greening programmes all need landscape contractors who can deliver at scale while saving water. FSAK builds landscapes designed for this future: water-efficient irrigation, native and adapted planting, and durable hardscape that holds up in the Saudi climate.

Budgeting

What does landscaping cost in Saudi Arabia?

Landscape cost in Saudi Arabia depends on site size, design complexity, plant selection, hardscape materials, irrigation needs, and ongoing maintenance. A small villa garden, a commercial plaza, and a public park sit at very different price points. The most accurate way to budget is a site visit and a bill of quantities. FSAK provides transparent, itemised quotations with no hidden fees, so you can plan your budget with confidence. 

FAQ

Frequently Asked Questions

Answers about landscape scope, water efficient design, maintenance and quotations.

A landscape works company designs, builds, and maintains outdoor spaces. This includes landscape design, hardscape such as paving and walls, softscape such as planting and lawns, irrigation systems, water features, and ongoing maintenance.

Yes. FSAK is headquartered in Riyadh and serves projects across the Kingdom, including Jeddah, Dammam, and the Eastern Province, by mobilising crews and equipment from our Riyadh base.

Hardscape refers to the built, non-living elements of a landscape, including paving, walls, and pergolas. Softscape is the living part, such as trees, shrubs, lawns, and flowers. FSAK delivers both under one contract.

Yes. We design efficient irrigation, drip systems, and drainage, and we select native and adapted plants that need less water, which suits the Saudi climate and Vision 2030 sustainability goals.

Yes. We offer ongoing maintenance contracts covering irrigation checks, pruning, mowing, fertilisation, pest control, and seasonal replanting to keep your landscape healthy year-round.

Request a site visit through our contact page. We assess the site, prepare a bill of quantities, and issue a transparent, itemised quotation with no hidden fees.

Start your project

Request Your Landscape Works Quotation

Ready to transform your outdoor space? Speak with FSAK’s landscape team for a free site assessment and a transparent, no-obligation quotation. We serve commercial, residential, and government projects across Saudi Arabia.