Boom Lift and Scissor Lift Rental in Saudi Arabia

FSAK Contracting supplies scissor lifts, boom lifts and telehandlers with work platforms to construction, industrial and maintenance teams across Saudi Arabia. Every machine is serviced and inspected before it leaves our yard, and our rental desk matches the right platform to your site conditions the same day you call.

What Are Boom Lifts and Scissor Lifts?

Both are Mobile Elevating Work Platforms. They raise workers, tools and materials to height on a guarded platform. The difference lies in how they move and where they reach.

Scissor Lifts

A scissor lift travels straight up on a criss cross steel mechanism. The platform is wide, usually 1.2 m to 3.5 m, so two or three workers can stand side by side with hand tools and small materials. Electric models produce zero exhaust, which makes them the standard choice for indoor warehouses, retail fit, outs and data centres. 

Working heights range from 6 m to 16 m. Platform capacity runs between 230 kg and 500 kg depending on model and extension.

Boom Lifts

Boom lifts, also called cherry pickers or man lifts, extend outward as well as upward. An articulating boom bends at one or more knuckle joints to reach over obstacles such as parapet walls, pipe racks. A telescopic boom stretches in a straight line for maximum horizontal outreach when the base must stay far from the structure.

Working heights for boom lifts commonly range from 12 m to 43 m, with horizontal outreach up to 23 m on larger telescopic models.

Telehandlers with Work Platforms

A telehandler fitted with a personnel basket offers a hybrid solution. It handles material placement with forks during one shift and becomes an access platform for installation or inspection work during the next. Working heights typically reach 12 m to 17 m depending on the telehandler model and basket rating.

Which Lift Type Suits Your Job?

FactorScissor LiftArticulating BoomTelescopic BoomTelehandler + Basket
Direction of reachVertical onlyUp, over and around obstaclesStraight up and outUp and forward
Working height6,16 m12,25 m15,43 m12,17 m
Horizontal outreachMinimalUp to 12 mUp to 23 mLimited by boom length
Best surfaceFlat, hard floorUneven outdoor groundOpen outdoor sitesMixed terrain
Typical useIndoor MEP, ceiling work, rackingFacade work, plant maintenanceTank and tower inspectionDual-purpose material + access
Operator skillBasic MEWP trainingMEWP Category 3bMEWP Category 3bTelehandler + MEWP ticket

If your job needs nothing more than straight vertical access on a flat floor, a scissor lift keeps costs lower and setup faster. When the work sits behind, above, or beyond a fixed obstacle, a boom lift earns its higher daily rate by cutting repositioning time from hours to minutes.

Equipment We Supply

FSAK Contracting stocks electric and diesel scissor lifts, articulating and telescopic boom lifts, and telehandler mounted work platforms. Fleet highlights include:

Electric scissor lifts, 6 m to 12 m working height, battery powered, non marking tyres, ideal for indoor sites.

Diesel / rough terrain scissor lifts, up to 16 m working height, four wheel drive, designed for graded and uneven ground.

Articulating boom lifts, 2 m to 25 m working height with multi joint reach for complex facades and plant internals.

Telescopic boom lifts, 15 m and above, with long horizontal outreach for tanks, stacks and high rise exteriors.

Telehandlers with personnel baskets, dual purpose machines for sites that need material handling and elevated access on the same shift.

All units carry current third party inspection certificates and are serviced on a preventive maintenance schedule before every rental dispatch. Harnesses, lanyards and platform mounted anchor points ship with every boom lift delivery.

Where We Operate

FSAK Contracting is headquartered in Riyadh and serves projects across Saudi Arabia. We regularly mobilise access equipment to Jeddah, Dammam, Khobar, Jubail, Yanbu, Tabuk, Mecca, Medina and the major industrial cities in the Eastern Province. For large-scale or long-term projects, we plan dedicated fleet allocation so your work at height schedule stays on track.

As part of a wider construction contracting operation in Riyadh, we pair access equipment rental with manpower, earthworks, road construction and utility installation, reducing the number of subcontractors on your vendor list.

Industries That Rely on Access Equipment

Access platforms are not limited to construction. FSAK supplies scissor lifts and boom lifts to:

Construction and fit out, facade glazing, cladding, external painting, fire protection installation, steel erection inspection.

Industrial and manufacturing, overhead crane maintenance, production line equipment access, factory lighting replacement.

Oil, gas and petrochemical, shutdown and turnaround work, pipe rack inspection, flare stack maintenance.

Warehousing and logistics, racking installation, sprinkler system servicing, high bay lighting upgrades.

Commercial property, HVAC duct installation, ceiling tile replacement, signage work inside malls and office towers.

Events and exhibitions, rigging, AV installation, temporary stage builds.

Whatever your sector, we match the platform type and working height to your safety and productivity requirements.

How the Rental Process Works

  1. Share your requirements. Tell us the working height, indoor or outdoor use, ground conditions, rental duration and site location.
  2. Receive a recommendation and quote. Our rental desk suggests the right platform type, confirms availability and sends a clear, itemised quotation.
  3. Confirm and schedule. Once you approve the quote, we lock in the machine and agree a delivery date.
  4. Delivery and handover. The lift arrives with current inspection papers. We walk your operator through the controls, check safety systems and hand over the machine.
  5. On site support. During the rental period, our technical team is available for troubleshooting and, where needed, emergency replacement.
  6. Collection and close,out. When the job is done, we collect the equipment after a joint inspection.

Why Rent Access Equipment from FSAK Contracting?

Contractor,owned fleet. Our machines sit in our own yard, not a broker’s marketplace. That means faster availability checks and no middleman mark up.

20+ years in Saudi construction. We understand site induction procedures, work permit workflows and the safety documentation your HSE team expects.

One supplier for multiple needs. FSAK is a full service contracting company that also provides heavy equipment rental in Riyadh, manpower, earthworks and civil construction, simplifying your procurement across trades.

Flexible rental terms. Daily, weekly, monthly and project-term rates. No penalty for early return if your programme changes.

Inspected and certified. Every platform carries a valid third-party inspection certificate. Maintenance records travel with the machine.

Wet or dry hire. Rent the machine alone, or add a trained MEWP operator. Either way, the platform and the paperwork are ready.

Frequently Asked Questions

What is the difference between a scissor lift and a boom lift?

A scissor lift moves straight up and down. It offers a larger platform area but no horizontal outreach. A boom lift, articulating or telescopic, extends outward as well as upward, letting operators reach over walls, pipe racks or machinery. Choose a scissor lift for flat-floor indoor work; choose a boom lift when you need to reach past an obstacle.

Yes. Electric scissor lifts run on battery power with zero exhaust and non-marking tyres. They are safe for enclosed spaces such as warehouses, data centres, shopping centres and food-processing plants.

FSAK offers both wet hire (machine plus trained operator) and dry hire (machine only). Operators hold current MEWP certification and are familiar with Saudi site-safety requirements.

Within Riyadh and major cities, mobilisation is typically 24 to 48 hours after confirmation. For planned projects, early booking secures your preferred machine and date.

Get an Access Equipment Quote

Tell us the working height, the site location and whether the job is indoors or outdoors. We will confirm the right platform, check availability and send a quote  usually within the same working day.