Construction Projects Portfolio in Saudi Arabia | FSAK Contracting

FSAK Contracting has delivered civil, infrastructure, and construction projects across Saudi Arabia for over 20 years. From major healthcare facilities in Riyadh and landmark financial districts to giga-project site works and energy infrastructure, every project below reflects our commitment to quality, compliance, and on-time delivery.

Healthcare Energy Infrastructure Commercial Tourism Utilities

Our portfolio

Our Completed Construction Projects in Riyadh & Across Saudi Arabia

Healthcare
01 · Riyadh

Dr Sulaiman Al Habib hospital King Fahad Road Riyadh

FSAK Contracting delivered enabling works and supporting infrastructure for this major healthcare facility on King Fahad Road, Riyadh. Our scope included site clearance, ground preparation, temporary access provisions, and civil support works to meet the stringent construction requirements of a medical-grade building. The project was executed in compliance with MOMRA standards and completed within the agreed programme.

Utilities
02 · Saudi Arabia

SWEDTEL PIONEERING FUTURE CONNECTIVITY

FSAK partnered with Swedtel to deliver underground utility and telecommunications infrastructure works across key urban areas in Saudi Arabia. Our scope covered trench excavation, duct installation, cable pulling, and full site reinstatement. Equipment supply and earthworks were coordinated to keep the programme on track while minimising disruption to existing services.

Infrastructure
03 · Jazan

Jazan Economic City — Groundworks & Infrastructure

FSAK was engaged to deliver essential groundworks and infrastructure development works within the Jazan Economic City project — one of Saudi Arabia’s most strategically significant industrial development zones. Our team managed bulk excavation, soil stabilisation, and civil site preparation across designated parcels within the economic city masterplan.

Healthcare
04 · Buraidah

Al-Habib Medical Group Hospital in Buraidah – OPD

Our team provided civil and structural support works for the Outpatient Department building of Al-Habib Medical Group Hospital in Buraidah. Works included ground preparation, concrete substructure support, temporary works management, and compliance inspections to meet healthcare facility construction standards in Saudi Arabia.

Energy
05 · Jazan

Jazan 3,850 MW Integrated Gasification Combined Cycle (IGCC)

FSAK contributed earthworks and civil site support to one of the world’s largest Integrated Gasification Combined Cycle (IGCC) power plants in Jazan, Saudi Arabia. Our scope included site preparation, bulk earthmoving, and equipment supply to support the construction of this landmark clean energy facility, which plays a central role in Saudi Arabia’s energy transition strategy under Vision 2030.

Commercial
06 · Riyadh

King Abdullah Financial District (KAFD)

As part of Riyadh’s future-focused financial district development, FSAK delivered enabling works and civil support for select structures within KAFD. Our teams operated within the district’s strict quality and HSE framework, delivering excavation, site preparation, and access provisions to the precision standards required by one of Saudi Arabia’s most high-profile urban developments.

As part of Riyadh’s future-focused financial hub, our scope included enabling works and civil support for select structures within the district. We ensured precision and quality in line with the project’s elite standards.

Infrastructure
07 · Riyadh

Riyadh Metro Project

FSAK Contracting supported the Riyadh Metro Project — one of the largest metro systems in the Middle East — with road construction works, infrastructure support, and site preparation services. Our teams worked alongside the primary construction consortia to deliver ground-level civil and road works across designated sections of the metro corridor, maintaining full compliance with Riyadh Municipality and Royal Commission requirements.

Tourism
08 · Red Sea Coast

Amaala Wellness Core, Triple Bay

FSAK contributed to site development and infrastructure preparation works for the Amaala Wellness Core at Triple Bay — one of Saudi Arabia’s premier luxury and wellness tourism destinations on the Red Sea coast. Our scope aligned with the project’s sustainability mandate, delivering enabling works and ground preparation in accordance with the project’s environmental and quality standards.

Why Clients Choose FSAK

Why Construction Clients Across Saudi Arabia Trust FSAK

Trusted construction and civil contractors in Riyadh — delivering from start to finish.

Proven Track Record

Trusted by government bodies, developers, and private sector clients across KSA

Full-Scope Capability

From earthworks and utility installation to road works and special structures

On-Time Delivery

Structured project management ensuring programmes are met without compromise

Professional Standards

MOMRA-compliant, Vision 2030-aligned, and built to international quality frameworks

Start your project

Start Your Next Construction Project With FSAK

Whether you are planning a residential development, a commercial facility, or a large-scale infrastructure project across Saudi Arabia, FSAK has the experience, equipment, and qualified teams to deliver it. With 20+ years of proven delivery across Riyadh and the Kingdom, we are ready to start your project.