You deal with one point of contact, not five. Here is the full site preparation scope we run on a Riyadh plot, in the order it happens on the ground.
01Survey & setting outCheck soil and levels, mark out the plot to the drawings
02Land clearingRemove trees, brush, rocks, old slabs and structures
03Topsoil strip & haulStrip topsoil, load and remove all spoil and debris
04Cut & fillMove earth to bring the plot to the right levels
05Grading & levellingLaser-guided grading to an even, true surface
06CompactionCompact in layers so the ground carries the load
07Subgrade prepReady the base for foundations or road layers
08Drainage & accessCut-off drains, erosion control and temporary access roads
A · LAND
Land clearing & site clearance
We clear the plot of trees, roots, brush, rocks, and old slabs, strip the topsoil, and haul away the spoil — leaving a clean, open site you can build on. If your plot needs deeper digging, our earth and enabling works team handles bulk excavation and ground improvement as a follow-on.
B · LEVEL
Grading & ground levelling
Grading shapes the land to the right slope and height; we use graders and laser-guided levelling for an even surface that also drains water away from the building. Ground levelling makes the pad flat and true to the design levels set in your drawings and the bill of quantities (BOQ).
C · FIRM
Compaction & subgrade prep
A level pad still needs to be firm. We compact the ground in layers so it carries the load, then prepare the subgrade so the foundation or road base sits on solid ground — lowering the risk of settling and cracks later.
D · DRAIN
Drainage, erosion control & debris removal
We add cut-off drains and slopes so rain runs off the pad, and control loose soil so it doesn't wash or blow onto nearby plots. All debris is removed, leaving the site clean and ready for the next trade.